Petrosazeh Shahbaz Arak company has signed a cooperation agreement with Lajvar , Sanayeh Ebda and Farayand Joosh Darian companies , that only Farayand Joosh Darian with the strong technical team has the following  work resume.

The product operation of peak launcher , K.o.Drum and tank projects by the technical team of Farayand Joosh Darian that there is a cooperation agreement between this company and ours. Since 1385, we have cooperated in production with this company.

This company has performed the above projects previously during the contract with Takestan Industrial Systems company that these are included in work background of Farayand Joosh Darian and  Takestan Industrial Systems companies.

Execute background of Farayand Joosh Darian company

Contract volume

Subject

Second employer

Contract date

Main employer

800 systems

produce dry gas filters types

Takestan industrial systems

80-85

Iran Gas National company

250 systems

produce seperator filters types

Takestan industrial systems

80-85

Iran Gas National company

200 systems

produce coil and  gas heaters

Takestan industrial systems

80-85

Iran Gas National company

50 systems

produce peak launcher and reciever

Takestan industrial systems

80-85

Iran Gas National company

80 systems

produce under- pressure tanks with 1 to 5 metres diameter

Takestan industrial systems

83

Nargan company and Jam Petrochemical

4 systems

K.o.Drum

Takestan industrial systems

84

Jam Petrochemical

4 systems

Seal – Drum

Takestan industrial systems

84

Jam Petrochemical

400 tons

Piperack

Takestan industrial systems

84

Jam Petrochemical

300 tons

Pipes and piping siphons

Takestan industrial systems

84-85

Jam Petrochemical

60 systems

produce odoriser types with stainless steel type

Takestan industrial systems

84

Iran Gas Petrochemical company

30 systems

Produce thermal transformators types

Azar Bokhar

80-81

Tondgooyan Petrochemical

1000 tons

Produce heavy and light heavy metal skeleton

Takestan industrial systems

82-85

Private sector

 

Execute background of Petrosazeh Shahbaz with the former name, Polymergostar Arak

Contract volume

Subject

Time period

Contract date

Contract number

employer

2 systems

Introduction of frameworks 3 and 4 for Anjirak storages

12 months

23.01.1382

Sa-P 82/2

Bragh Bakhtar

1 system

Design, produce, install and implement operation of sport framework constructions with 42531.5 square metres dimensions

3 months

22.10.1382

M V/100/15493

Pars Energy Economic Specific Area(club sport)

9 systems

Design, produce, install and implement the two-story residential framework

4 months

06.10.1382

M V/100/19185

Pars Energy Economic Specific Area(two-story residential camp)

1 system

Perchase and install the 4-span parking framework with footing  beam 6 m long , 50 cm wide, 50 cm high

PZP-82128-IS

Pars Energy Economic Specific Area(parking of substructure affairs office)

1 system

Approximately 141,120 kg framework

78 days

12.09.1382

6856

Taklan

Design, produce and install substructure construction railings of specific area)

1 month

21.09.1382

Pars Energy Economic Specific Area(substructure construction railings)

1 system

diesel generator and laundry and storage framework

20 days

12.07.1382

PZP-82125-PM

Pars Energy Economic Specific Area(diesel generator and laundry and storage framework)

1 system

 Prepare and install 7.5 m high and 48 m ling framework with 20 metres span

60 days

 15.09.1382

Mr. Mohsen Mohammadi

1 system

Prepare and install the framework

90 days

01.06.1382

110

Ali Enayati

1 system

Product and montage operation of Jib 35 Ton project

60 work days

26.06.1385

85-11116

Karasazeh Kimia

2 systems

Product and montage operation of furnace project metal straucture

45 work days

28.06.1385

85-1100/2687

Zarrin Suleh

2 systems

 Product and montage operation of heater 3000

30 work days

20.07.1385

85/3564

Arya Petro Jam

4 systems

Product and montage operation of 2- inch filter 600

2 systems

Product and montage operation of odotiser 10000